
Sourcing electronics and equipment from China
We run large sourcing projects end to end: we supply electronics, equip factories with machinery and lines, and arrange regular series batches of components and finished products. We do not do one-off purchases.
Discuss a project
Write to us by email
Please include in your email
- Company name
- Company website
- Contact details
- A short description of your project
By sending an email you agree to the processing of your personal data — privacy policy.
Who it is for
- Distributors, retailers and corporate clients who need large batches of electronics.
- Manufacturing companies and investors equipping a workshop or a line.
- Companies with a serial product that need regular batches of components under a long-term contract.
- Brands that order finished products in series batches, including under their own brand.
What is included
- Analysing the task and requirements for the supply: what is needed, in what volume, with which specifications and documents.
- Finding manufacturers and checking factories.
- Samples, comparing offers, negotiating the terms of a long-term contract.
- Quality control at the factory and acceptance of every batch before shipment.
- Logistics and customs clearance: from loading in China to a warehouse in Russia.
- For equipment — installation and commissioning at your site.
- Supporting regular supplies: schedule, quality, replacing a supplier if needed.
We take only large sourcing projects. One-off purchases, small batches and picking individual components are not our format. We work only with legal supply chains: no sanctioned goods and no dual-use goods.
What you get
A batch of electronics in your warehouse, an equipped factory or a running flow of series supplies — with verified suppliers, documents and legal import.
Ways to work with us
- Large batches of electronics: finished devices and electronic modules.
- Factory equipment: machinery and lines with installation and commissioning.
- Regular series supplies of components under a long-term contract.
- Series batches of finished products, including under your brand.
Stages and timeline
As a guide: two to four months from the start to the delivery of a series batch. For equipment and lines the timeline is longer: it depends on manufacturing and installation. We fix the exact schedule in the plan after analysing the task.
Weeks 1–2
up to 2 weeks
1. Analysing the task and requirements
We clarify what needs to be supplied, in what volume, with which specifications and documents. The result is a supply specification and a project plan.
Weeks 2–5
3–4 weeks
2. Finding and checking suppliers
We select manufacturers, check factories and their documents, request offers and compare terms.
Weeks 4–7
3–4 weeks
3. Samples, terms and contract
We receive and check samples, negotiate price and timeframes, and draw up a long-term contract with the supplier.
Weeks 6–12
4–8 weeks
4. Production and quality control
We follow manufacturing, check quality at the factory and accept the batch before shipment.
Weeks 10–15
3–5 weeks
5. Logistics and customs
We arrange transport from China, customs clearance and delivery to your warehouse, and prepare the import documents.
Weeks 13–16
2–4 weeks
6. Acceptance, installation and commissioning
We receive the cargo and, for equipment, carry out installation and commissioning at your site. After that we support regular supplies.
How to start
We start with a pre-project stage: we analyse the task, estimate the timeline and budget, and propose a plan. This stage is paid at a fixed price, so you get a valuable result even if you decide to continue without us.
Questions and answers
What is the minimum project size?
We take only large projects: equipping factories and regular series supplies. The exact threshold depends on the type of supply, so there is no single figure. Write to us about your project and we will tell you straight away whether it fits.
Who handles customs clearance?
We arrange logistics and customs clearance. You receive the cargo at your warehouse with the full set of import documents.
How long does a delivery take?
A series batch usually takes two to four months. Equipment and lines take longer: manufacturing and installation are added. The stages are set out in the “Stages and timeline” section.
Can I order a one-off purchase or a small batch from you?
No. We run only large projects: equipping factories and regular series supplies.

Tell us about your project — we reply within 1–2 business days
Tell us
Write to us by email
Please include in your email
- Company name
- Company website
- Contact details
- A short description of your project
By sending an email you agree to the processing of your personal data — privacy policy.